Share

NewsSpringfield signal timing trial delivers win for drivers, may expand

Springfield signal timing trial delivers win for drivers, may expand

Kelowna’s nine-month Adaptive Signal Timing Trial on Springfield Road has delivered significant improvements in traffic flow, reduced delays, and cut emissions, according to a report set to be presented to city council.

The pilot, which ran from September 2024 to June 2025, used the NoTraffic System to manage signals at five intersections between Leckie and Spall in real time.

Unlike traditional pre-programmed signal schedules, the adaptive system dynamically adjusted green light durations based on live traffic data, optimizing flow and reducing congestion.

The results were impressive, according to the authors of a report that will go before lawmakers Monday afternoon.

Eastbound travel times improved by 4 per cent, saving drivers an average of 20 seconds per trip, while westbound times saw smaller but meaningful gains.

During peak afternoon hours, eastbound trips were 5 per cent faster, and midday westbound travel improved by up to 32 seconds. These time savings add up, with over 39,000 hours saved annually for the 30,000+ daily users of the corridor.

The system also reduced stop-and-go traffic, cutting delays at major intersections. The largest improvements were seen at Springfield and Dilworth, which accounted for 40 per cent of the total delay reduction, followed by Cooper and Spall intersections.

Side streets experienced only minor delays, averaging 2–5 seconds per vehicle, and pedestrian crossings were unaffected.

In addition to saving time, the trial reduced vehicle emissions by 131.5 tonnes of CO2 annually, contributing to the city’s environmental goals.

Given the success of the pilot, city staff are recommending an expansion of the adaptive signal program to other busy corridors, including more sections of Springfield, Spall and Enterprise, and Richter, from Southerland to Lakeshore.

The proposed rollout would prioritize areas with similar congestion patterns to maximize benefits.

“Maximizing the efficiency of our existing infrastructure is the most cost-effective way to improve traffic mobility,” the report read. “This program delivers shorter travel times, lower emissions, and a better driving experience for Kelowna residents.”

Lawmakers are expected to review the proposal and decide on the program’s expansion in the coming weeks.

If approved, the next phase could begin as early as 2025, bringing citywide improvements to traffic flow and commute times.

Tyler Marr
Tyler Marr
Tyler Marr has worked as a journalist and content wizard in Western Canada for over a decade, covering a range of stories from federal elections to the Humboldt Broncos tragedy. Known for his sharp storytelling and even sharper wit, he’s a newsroom veteran who when not chasing headlines, is probably chasing plans for his next vacation.

In The News

Related