Drivers are being advised by the BC Transportation Ministry of upcoming traffic changes on Highway 97 between Callan Road and North Beach Road as long-term stabilization work begins at the North Beach rockslide site.
Starting Monday, November 3 new traffic lines will be painted and the amount of traffic cones will be reduced. The Ministry of Transportation says the traffic-pattern changes will remain in place until spring 2027 and commuters should expect delays.
Site preparation will begin in November 2025. During construction, brief highway closures may be required between 9 a.m. and 3 p.m. These will be limited to no more than two per day and will last no more than 20 minutes. Closures will be scheduled only when necessary and will occur intermittently throughout the project. Site-preparation work will include rock scaling and controlled blasting.
Work on the project is scheduled to take place Monday to Friday from 7 a.m. to 5 p.m. with potential for weekend work. No traffic-affecting work will take place on holidays or long weekends.
Drivers are asked to use caution through the area, obey posted speed limits and follow the directions of traffic-control personnel.
For up-to-date information about the closure and road conditions on alternative routes visit: https://drivebc.ca

